Recladding an Occupied Building

Retrofit work carries constraints a new build never sees: occupied floors, restricted crane time, and an existing substrate nobody fully documented.

Recladding an Occupied Building

Survey first, specify second

An as-built survey of the existing substrate decides the bracket strategy. Assuming a nominal slab edge is the most common source of change orders.

Installing from the inside

Panels installed from inside using a standard spider crane remove the need for continuous external access.